Skip to main content
Dar El Fouad Hospital medical facility ductwork
Healthcare

Dar El Fouad Hospital

6th of October City2015–2016

Healthcare HVAC supply with Shaker Group listed as consultant and a quantity of 40 tons.

Recorded quantity
40 t
Execution period
2015–2016
Consultant
Shaker Group
Overview

About the Dar El Fouad Hospital project

Dar El Fouad Hospital in 6th of October City is a healthcare reference in Duct Technology's portfolio. HVAC ductwork was supplied in 2015–2016, with Shaker Group listed as consultant and a recorded quantity of 40 tons. Healthcare work is fabricated to the drawings and the standards the consultant specifies.

Project facts

Dar El Fouad Hospital project facts

The table below records the facts held for the Dar El Fouad Hospital project: where it is, which sector it serves, when the work was executed and who the consultant or contractor was. Quantities are tons of ductwork recorded in Duct Technology's reference list.

Dar El Fouad Hospital project facts
AttributeDetail
Location6th of October City
SectorHealthcare
Execution period2015–2016
ConsultantShaker Group
Recorded quantity40 t
ScopeHVAC ductwork

Planning a project like Dar El Fouad Hospital?

Send your drawings, quantities and consultant specification. Our estimation team will respond with a technical review and a quotation.