
Wadi El Nile Hospital
Hadayiq Al Qobah, Cairo2010–2016Delta for Construction520 t

Mostorod, Cairo2015–2016
Industrial refinery HVAC reference with Hassan Allam Construction and a listed quantity of 60 tons.
The Refinery Project (ERC) in Mostorod, Cairo is an industrial reference for Duct Technology. HVAC ductwork was supplied during 2015–2016 with Hassan Allam Construction as contractor and a recorded quantity of 60 tons, manufactured to the drawings and specifications issued for the industrial facility.
The table below records the facts held for the Refinery Project (ERC) project: where it is, which sector it serves, when the work was executed and who the consultant or contractor was. Quantities are tons of ductwork recorded in Duct Technology's reference list.
| Attribute | Detail |
|---|---|
| Location | Mostorod, Cairo |
| Sector | Industrial |
| Execution period | 2015–2016 |
| Contractor | Hassan Allam Construction |
| Recorded quantity | 60 t |
| Scope | HVAC ductwork |
Send your drawings, quantities and consultant specification. Our estimation team will respond with a technical review and a quotation.